-
Start Digging Hole
-
Hole Done, Install Ramp Board
-
Ramp Board and Back Board in Place
-
Ramp Board is at 45 Degrees, Back Board is Vertical but the Picture Distorts the Angle
-
Sliding Mounting Post into Hole Belayed by Rope Attached to Top
-
Mounting Post Near Bottom of Hole
-
Mounting Post in Hole and Now Preparing to Remove Ramp Board and Back Board
-
Mounting Post Vertically in Hole, 6 Feet Deep
-
Starting to Backfill Hole, Rope at Top is to Make Sure Post Didn’t Start to Tip Toward Ramp
-
Making Sure Post is Still Vertical While Backfilling Hole
-
Final Install, Looking Past Post Shows Where Antenna Will Come Down onto the Concrete Area for Maintenance
-
Backing up Cargo Trailer to the Mounting Post
-
Bolting Tower to Mounting Post
-
Lifting is Activated and the Cargo Trailer is Removed
-
Lifting Tower to Full Upright Position
-
Tower is Fully Upright
-
Tower Extended to Expose Rotor Plate at Top
-
Tower Extended to Full Height
-
Installing PVC Conduit Under Sidewalk to Run Cables Over to the House
-
Top View of Cable Conduit
-
Finished Conduit with Ground Coverings Replaced